



| Detailes Of Steel Structure Hangar | ||
| Main Steel Frame | Column | Q235, Q345 Welded H Section Steel |
| Beam | Q235, Q345 Welded H Section Steel | |
| Secondary Frame | Purlin | Q235 C and Z purlin |
| Knee brace | Q235 Angle Steel | |
| Tie Rod | Q235 Circular Steel Pipe | |
| Brace | Q235 Round Bar | |
| Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | |
| Maintenance system | Roof Panel | EPS Sandwich Panel / Glass Fiber Sandwich Panel / |
| Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet | ||
| Wall Panel | Sandwich Panel / Corrugated Steel Sheet | |
| Accessories | Window | Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window |
| Door | Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door | |
| Rainspout | PVC | |
| Live load on Roof | In 120kg/Sqm (Color steel panel surrounded) | |
| Wind Resistance Grade | 12 Grades | |
| Earthquake-resistance | 8 Grades | |
| Structure Usage | Up to 50 years | |
| Temperature | Suitable temperature.-50°C~+50°C | |
| Paint Options | Alkyd paiting, two primary painting, two finish painting | |
| (gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized. | ||
Int’l Trade team: We have six internatioanl trade businessman onlines 24 hours.
Maintenance: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.